When the Internal Requisition will get generate if I define
an OSP operation in sequence 30. 10 & 20 will be other than
OSP operations.
Answer Posted / santhosh kumar gp
It all depends on how u set the Requisition Creation Time
parameter in WIP Parameters' Outside Processing Tab.
1. At Job/ Schedule Release
2. At Operation
3. Manual
Is This Answer Correct ? | 16 Yes | 1 No |