Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the difference between site engineer & site incharge

Answer Posted / dushyant

There can be many site engineers their nos. depend on the
size of sit
whilest there is always only one site incharge.
The site incharge is whole and sole responsible for all the
work done on site. and he guides all other site engineers.

Is This Answer Correct ?    46 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is directivity effect?

2276


what is pouring and explain

2399


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

2101


how much percent are used 20mm,10mm?

2024


What is the difference between chamfer and fillet?

1533


how many material required for brickbat water proofing of toilets.

2063


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2830


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2167


how can we construct building without foundation providing only grade beam at ground level

1763


what is meant by csr in foundation? what is sbc?what is meant by contour line?

2439


What is the sugested procedure of water purification for public supply?

2366


how many digree of freedom in four bar chain

2451


why +1 to be followed for calculating the no of bars in BBS. Please explain

2034


Define Workability ?

1319


for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help

2094