how can we find setll setgt chain read reade readp
operations are successfull or not,give example.explain in
detail.
Answer Posted / harshad r suryawaunshi
Use If %found with Chain and with inedicator with and all
READ operations. if chain is unsuccessful execution of
lines in %found loop will not executed. if Read is success
full the mentioned indicator will be off.
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
How Chain operation copies the record's data to the input buffer for the program?
What is ment by record level identifier?
thanks mr.Harshad R Suryawaunshi,i'm new to as400 i think you are telling in rpgile i know only rpg400 if possible can you tell in rpg400
what do you mean by an input subfile, what are the keywords required?
can anybody help me to solve this problem. the program that i m checking display error message saying "Record format for file AJDSPFFD does not match model file and decimal error. how to solve this problem. The AJDSPFFD is snapshot the AJTLOG that is the audit trail list.
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique
1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?
How can we know running job is batch or interactive?
What is the purpose of record level identifier?
How to write record if no field or the field are different in physical file in rpgle ?
what is the necessary keyword needed to scroll subfile records?
during execution, an rpg/400 program automatically follows a sequence of operations for each record that is processed. The built-in program cycle includes the following logical steps.
if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.
how can you display specific subfile page on the screen in unequal subfile?