i need rs aggarwal verbal &nonverbal book download link
plzzzzzzzzzzzzzz i nned by 2marow morning

Answer Posted / rahulchatterjee

http://rapidshare.com/files/123661459/RS_Aggarwal_Verbal_Reasoning.rar

Is This Answer Correct ?    31 Yes 43 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In a company 241 apply for posts. of them 40 know neither c nor c++.180 know c; 186 knows c++. how many people know only c.

816


Find the difference of the minimum number of numbers required to form every number from 1 to 1234 and 1 to 4321.

860


9 cards are there. you have to arrange them in a 3*3 matrix. cards are of 4 colours.they are red,yellow,blue,green. conditions for arrangement: one red card must be in first row or second row.2 green cards should be in 3rd column.Yellow cards must be in the 3 corners only. Two blue cards must be in the 2nd row. At least one green card in each row.

733


After spending 2/3 of his salary on rent and food items and 1/4th of the remaining on transportation, Rajesh has 6000 with him. How much did he pay on transportation?

1741


The average of x and y is 6.5. if z=4,what is the average of x,y,z.

713






15 Men take 21 days of 8 hrs. each to do a piece of work. How many days of 6 hrs. each would do if 21 women take. If 3 women do as much work of 2 men.

741


What is the probability of getting a sum 9 from two throws of a dice?

903


mention your extra-curricular interest. Which do you actively pursue? how do you see these developing in the future?

2949


govern of irda,sebi and rbi

2822


Imagine 4 persons A,B,C,D.(It is a strength determining game). A found it hard,but could pull 'c' and 'd' to his side. AC and BD pairs on opposite sides found themselves equally balanced. When A and B exchanged their positions to form pairs AD and BC ,BC pair could win and pull AD to their side.Order the 4 persons in Ascending order according to their strengths.

686


A can do a piece of work in 20 days, which B can do in 12 days. In 9 days B does ¾ of the work. How many days will A take to finish the remaining work?

693


Alok and Bhanu play the following min-max game. Given the expression N = X - Y – Z where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be • 4 • -18 • 9 • 2

2151


'X' liters of petrol can be filled in an automobiles tank. What part of full tank was removed, if 'Y' liters was removed when the tank was full?

691


what is the largest prime number in 8 digit number?

668


If two pencils cost 8 cents, then how much do 5 pencils cost?

1022