What is Replenishment lead time?

Answer Posted / debaditya

RLT=The time taken by the material to be replenished

For trading goods:
------------------
RLT=plant delivery time+goods reciept processing time

For finished goods:
-------------------
RLT=Inhouse production time

Is This Answer Correct ?    13 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Bom usage when we create a bom through cs01, what effect does bom usage field have on subsequent configuration? For example, if we take it as 1=production or 5=sales what effect will it have on subsequent processes?

678


Tax jurisdiction processing is a close link between which two modules?

642


List out the five features you can control for the sale document type?

726


How to create the source and target database connections in the server manager?

699


Can one business area be assigned to several company codes? Which (sub) module of sap could make business areas obsolete?

669






Hi SD Gurus, Have you involved in any Development work for your client? What is the development task that you done for your client / assigned by your client? I want only Business Scenarios, no theory and how did you meet the client requirement which is not met by SAP Standard configuration? I want detailed Procedure, Analysis, Simple coding if any (Please Do not give complex coding steps) Detailed explanation, steps, along with resolution and give more emphasis on how did you arrived at the solution / resolution and logic behind it? I have been asked this question in an recent interview? It’s Urgent!!!!!! Please provide 2-4 real time data examples from your SAP SD Implementation Project? This is most frequently asked question in almost in all interviews. So, I request you to provide solutions to above question as early as possible? Your timely help would be greatly appreciated? Thanks in advance Regards

2308


At which levels in the sales document can you have different incompletion procedures?

634


A Client wants to connect his SAP ECC system to his SAP CRM system. What do you want to do to enable the integration. a)Install the plug-in on the CRM system and connect to the R/3 adapter in the ECC system b)Install the XIF adapter on the CRM system and connect to the R/3 adapter in the ECC system c) Install the XIF adapter in the ECC system and connect to the R/3 adapter in the CRM system D)Install the plug-in on the ECC system and connect to the R/3 adapter in the CRM system

1475


one of interviewer asked me this requirement please tell me anybody? Issue: the problem faced by us right now is,when there are more than 2 route codes available, users can select a wrong route code which is a longer route for the destination, the physical shipment can still go through a shorter route, but company will end up in paying more. Requirement: user maintained route list, the user will maintain a master from which route should be picked, users should be able to enable or disable a particular route. Thanks in advance

1201


Infostructure filling we have two company codes and new infostructure s004 for filling. We must fill it with data from first cc only. Is there any problem if the people who create orders, deliveries, and billing of second cc work at this time?

643


I created a new info structure and activated update rules for it. What is the best way to transport them into a productive system?

602


The transaction code used to create a return delivery?

548


Diff between business sale cycle nd customer sale cycles?

625


What are the various configuration methods available in stms? : transportation management

612


Copying is not possible. because an entry is missing in Table TVCPL: TA TAN Message No. VL473

2268