Answer Posted / guest
A GDG base is created in the system catalog and keeps track
of the generation numbers used for datasets in the group.
IDCAMS utility is used to define the GDG base.
| Is This Answer Correct ? | 26 Yes | 4 No |
Post New Answer View All Answers
Can we call instream to catalog and catalog to instream?
WORKING-STORAGE SECTION. 01 GROSS-PAY. 05 BASIC-PAY PIC 9(5). 05 ALLOWENCES PIC 9(3). PROCEDURE DIVISION. MOVE 1000 TO BASIC-PAY. MOVE 250 TO ALLOWENCES. DISPLAY GROSS-PAY. STOP RUN. 77 W-A PIC 9(3)V99 VALUE 23.75 77 W-B PIC ZZ9V99 VLAUE 123.45 after the statement MOVE W-A TO W-B what will be W-B's value? a.123.75 b.b23.75 (where b indicates space) c.023.75 d.invalid move
what is the JCL statement consists of?
What is condition checking in jcl? Is this possible?
Explain how can the disposition of sysout datasets be set for an entire jobstream?
In sms datasets, what is the function of the dd avgrec keyword?
What are the parameter we cannot use in procedure? How many instream we can write in single jcl?
I need exexution process for JCL programs
how you can direct the data to spool using SYSOUT option?
What are the jcl procedures?
Step 1 RC 4 Step 2 Step 3 I want to know the COND parameter which can be coded in step 2 or 3. Step 2 should be executed based on Step 1 RC and Step 3 should not be executed based on step 1's RC
Matching Logic in Jcl not in cobol.Could any one please answer this question
When space is allocated for an output dataset, what units can be used?
Explain how can return codes be tested before execution of a job step?
a dd statement has 2 types of parameters. Name them?