Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

You have a *USE authority on a Library and *All authority
on a file in that Library.Can you change the data in that
file?

Answer Posted / vikas

Yes we can change data on file.

Is This Answer Correct ?    13 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what do you mean by an input subfile, what are the keywords required?

1302


How to call one program from another program in RPG? please help me with the code

1783


during execution, an rpg/400 program automatically follows a sequence of operations for each record that is processed. The built-in program cycle includes the following logical steps.

1276


Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?

1964


How to declare the pull button in AS/400..

2383


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

1301


what is data area and how it is used in rpg program ?

1378


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2302


how do I preserve and clean the array?

1204


how does the rpg element work?

1290


What is ment by record level identifier?

1184


what is program status data structure?

2511


1. If there are two programs using same file and 2 users are using the file at the same time and what can be done to allow them both to access? 2. How can remove lock from the file for accessing it by both users?

998


what is the use of sflnxtchg?

1314


How to handle duplicate error handling in RPG?

2347