Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Un-Answered Questions { Electrical Engineering }

what is settable hystersis protection? If any body knows plz kindly post the answer..

2067


what is the formula for computing cable tray size & capacity

2171


what clearance required for 4.5 mva dry type transformer?

2034


How can we select suitable capacity generator for three phase load (inductive load) and how to take study analysis in 3 three phase load system ?

2159


The loads are connected with phase and ground then why current flow as the loads ?

1976


what is the purpose of using filters in a protective relaying scheme?

2271


What is the Basic Difference bitween Long Shunt Connection and Short Shunt Connection in DC Generator?

2354


how much GROUND & NEUTRAL VOLT maintain in data center.

2061


how calculated Transformer losses.

2049


what is the safety points of vaccum circuit breaker.

2091


IF TVM OF TRANSFORMER SHOWS POWER FACTOR ON 33 KV SIDE AS 0.97 LAGGING AND ON 132 KV SIDE IS 0.75 LEADING.IS THIS CORRECT.WHERE IS PROBLEM.

2372


What will be the size of copper cable (each for 3 phase and 1 neutral) from Service connection Kit-Kat to Panel Board (i.e. to main switch) for a 6 pole 3-phase AC induction motor of 200 H.P. capacity? Amp-255 A, Frequency:- 1450 rpm.

1977


How cable from Kit-Kat to main switch, from starter to motor are designed?

2123


explain wiring system

2586


why in a swquence network representation, the negetive sequence generated voltage is taken as zero?

2022