Question 100 - (a) Time evolution in Heisenberg picture, according to Ehrenfest theorem is m (d / dt) < r > = < p >, where m = mass, r = position, p = momentum of a particle. If v = velocity, prove that m < v > = < p >. (b) Lande g-factor is given by Gj = Gl [ J (J + 1) - S (S + 1) + L (L + 1) ] / [ 2J (J + 1) ] + Gs [ J (J + 1) + S (S + 1) - L (L + 1) ] / [ 2J (J + 1) ]. If Gl = 1 and under approximation of Gs = 2, prove by calculation that Gj = (3/2) + [ S (S + 1) - L (L + 1) ] / [ 2J (J + 1) ].
1 2510Will i get the visa?, I travel to us back in 2007, with a tourist visa and stay to work, got married in 2008 with a citizen and got my green card, when i applied for a renewal i got an extension on my green card while proccesing but i got back to peru and my application was rejected while overseas on 2011, never got back to us since. Know i have an option to go work in a cruise line and need to apply for a c1d visa, i want to know if i have a chance to be approved or its just a waste of time for wath happend in the past. Thank you for any answer.
1450REACTION ENGINEERING - EXAMPLE 13.2 : A batch reactor is designed for the system of the irreversible, elementary liquid-phase hydration of butylene oxide that produces butylene glycol. At the reaction temperature T = 323 K, the reaction rate constant is k = 0.00083 L / (mol - min). The initial concentration of butylene oxide is 0.25 mol / L = Ca. The reaction is conducted using water as the solvent, so that water is in large excess. (a) Let the molecular weight of water is 18 g / mol and the mass of 1 kg in 1 L of water, calculate the molar density of water, Cb in the unit of mol / L. (b) Determine the final conversion, X of butylene oxide in the batch reactor after t = 45 min of reaction time. Use the formula X = 1 - 1 / exp [ kt (Cb) ] derived from material balance. (c) Find the equation of t as a function of X.
1 2376REACTION ENGINEERING - EXAMPLE 13.3 : The half-life for first order reaction could be described in the differential equation dC / dt = -kC where k is a constant, C is concentration and t is time. (a) Find the equation of C as a function of t. (b) Find the half life for such reaction or the time required to reduce 50 % of the initial concentration, where k = 0.139 per minute. (c) When the initial concentration Co is 16 mol / cubic metre, how long does the reaction required to achieve the final concentration of 1 mol / cubic metre?
1 2159BIOPROCESS ENGINEERING - EXAMPLE 14.1 : In differential centrifugation of cells with diameter D in centimeter, the square of D is given by D x D = [18n ln (RF / RI) ] / [ (RP - RFF) Wt ] where n is the fluid viscosity (poise), RF is the final radius of rotation (cm), RI is the initial radius of rotation (cm), RP is cell density (g / ml), RFF is the fluid density (g/ml), W the square for the rotational velocity in (radians / s) (radians / s), t is the time required to sediment from RI to RF (s). Derive an equation for W as a function for D, n, RF, RI, RP, RFF and t, with the stated units above, in radian & degree.
1 2514BIOPROCESS ENGINEERING - EXAMPLE 14.2 : An aqueous solution with 2.5 g of a protein dissolved in 600 cubic centimeters of a solution at 20 degree Celsius was placed in a container that has a water-permeable membrane. Water permeated through the membrane until the h - level of the solution was 0.9 cm above the pure water. (a) Calculate the absolute temperature of the solution, T in Kelvin, where T (Kelvin) = T (degree Celsius) + 273.15. (b) Calculate the osmotic pressure, P of the solution by using the formula P = hrg where h is level of the solution, r is density of water with 1000 kg per cubic meter, g = 9.81 N / kg as gravitational acceleration. (c) Calculate the concentration of the protein solution, C in kg / cubic meter. (d) Calculate the molecular weight of the protein, (MW) = CRT / P where R = 8.314 Pa cubic meter / (mol K) as ideal gas constant.
1 2703I have problem in APFC panel -0.44 while load ON time, i have replaced APFC display & checked the CT supply are ok. how to solve the problem
1581ENGINEERING DRAWING - EXAMPLE 18.3 : Autocad computer program is used to draw a pipe that is used to transport natural gases for processing. Actual length of the pipe is 10 metres. The pipe has cross sectional area of circle in shape with measured circumference of s = 3 metres. (a) If 10 units are used to represent the actual length of the pipe in computerised engineering drawing, find the diameter of the pipe, d that will be shown in the engineering drawing. (b) If one unit in the program equals to 1 centimetre, find the scale used in the computer program.
1 2650DIFFERENTIAL EQUATIONS - EXAMPLE 20.2 : During the landing process of an airplane, the velocity is constant at v. (a) If the displacement of the plane is x at time t, find the differential equation that relates t, x and v. (b) The plane has 2 parts of wheels - the front and the back, separated by a distance L. The front part of the wheel touches the land first, that allows the straight body of the plane to form an angle T with the horizontal land. If the vertical distance between the back part of the wheel and the horizontal land is y, find the equation of y as a function of L and T. (c) Find the differential equation that relates dy as a function of dt, v and sin T. (d) Find the differential equation that consist of dy as a function of y, L, v and dt. (e) Find the equation of y as a function of v, L, t and C where C is a constant. (f) When t = 0, prove that y = exp C as the initial value of y.
1 2681
What is the SimpleTimeZone class?
If we opened Windows Internet Explorer 4 times, does it starts 4 processes or 4 threads?
How to set the time zone for MySQL to particular country time?
I am fresher and i have completed my software testing course and i don't have real time experience,can anybody help me regarding financial domain projects,main testcases in that domain.
What is a time reference characteristic?
What is RCW (Run time Callable Wrappers)?
I am surekha new commer for this site? I have some doubt's pls clarify it..... I finished my B.tech and S/w Testing Course Now iam searching for a job in Testing, I did not have any experience in real time projects. Any body can send me the sample Testcases,Srs,Matrix for Banking,ERP Projects etc.Here is my email id surekhai@yahoo.com
what is the Property used to add a menus at runtime?
What is the important aspect of a real-time system?
There is very little time to test due to the development team delay how will you handle this situation?
How u r managing the time constraints in completing the project?
How will you load dynamic assembly? How will create assemblies at run time?
Would you be able to do time-recording?
Describe a time where a creative approach to meeting an objective didn?t work and what you did next?
Describe a time your company did not deliver on its product or service and how you responded?