Are there characteristics of a system that cannot be
established during system engineering activities? Describe
the characteristics, if any, and explain why a
consideration of them must be delayed until later
engineering steps.
Answer / ketan korat
When putting a system together, the different components
interacting may show unexpected behaviors. It is hard to be
able to predict these completely.
A typical example happens in power plants when running steam
boilers or power generators in parallel. The load is not
distributed evenly, as would happen on a stand alone unit,
but needs to be constantly tweaked.
In addition, there are unexpected configurations resulting
from the installation itself, which create unstable modes
due to interaction. These must be addressed and proper
compensation through the control system be applied,
| Is This Answer Correct ? | 1 Yes | 0 No |
what are the roles and responsibilities of a QA engineer as well as QA lead
What kind of Reporting you do?
what is difference between get and post method in load runner or it same as the concept in html form
How to calculate decision table conditions and actions on the following questions. The following specification is given: A railway has four different kinds of accommodation with different ticket prices: Hard seat, soft seat, hard sleeper, and soft sleeper. For hard sleeper, there are different prices for lower, middle and upper berth. For soft sleeper, there is a different price for lower and upper berth. For sleeping accommodation, different prices apply for non-air-condition and aircondition. For soft sleeper, a higher price applies for compartments with own bathroom. High-speed trains exist, but have only hard and soft seat, and they have another price than “normal” trains. How many different valid combinations of inputs exist for computing the price? a) 12 b) 16 c) 18 d) 36
Explain waterfall model? what will the testing team do in Requirement phase in this model and what happens in design phase?
what are the priliminary expectations from smoke testing from developer and QA point of view
can you tell me the industrial visit companies in Chennai?
Explain the deployment process?
those who need industrial visit in chennai,pls contact me?
How do an incremental process model and certification work together to produce high quality software? In your own words, describe the intent of certification in the clean room software engineering context.
Explain the main differences between software review and software inspection or walkthrough
what are the usual metrics one have to apply for SW improvement projects