Are there characteristics of a system that cannot be
established during system engineering activities? Describe
the characteristics, if any, and explain why a
consideration of them must be delayed until later
engineering steps.
Answer Posted / ketan korat
When putting a system together, the different components
interacting may show unexpected behaviors. It is hard to be
able to predict these completely.
A typical example happens in power plants when running steam
boilers or power generators in parallel. The load is not
distributed evenly, as would happen on a stand alone unit,
but needs to be constantly tweaked.
In addition, there are unexpected configurations resulting
from the installation itself, which create unstable modes
due to interaction. These must be addressed and proper
compensation through the control system be applied,
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
I am looking for interview question / technical questions for veritas netbackup.
is all the test cases to be automized !!! if yes / no let explain the reason
what are the usual metrics one have to apply for SW improvement projects
How would you do an Estimation?
Hi Friends... I faced an question in Tcs.But i unable to answer. find the question below.. A root filesytem"c0t0d0s0" caries 100 gb data. in this filesystem. i am having 3 files named a,b,c it caries 20 gb data each. I need to take backup only 3 files a,b,c. How i can take. Note you need to take only 3 files to an single tape having capacity 80 gb. Whats the commad used?
What are ‘throwaway’ prototypes and ‘evolutionary’ prototypes? How can production of a prototype be controlled and why is this important?
what are the disadvantages of selenium IDE..?
Explain the main differences between software review and software inspection or walkthrough
explain the basic QA plan to co-op with development plan for effective delivery of the product
brief about the methodologies to evaluate weightage of test cases and what are the basic parameters to be considered
what is regression testing, how effectively the QA lead / manager can implement this for product qualification
explain the methodologies / ways to create the test cases for QA
What are the negative test cases for water bottle?
Explain the deployment process?
Explain waterfall model? what will the testing team do in Requirement phase in this model and what happens in design phase?