in early medevial india what did the term jital refer to
Answers were Sorted based on User's Feedback
Sir iam going to write exam for the post of Officers under training in APSRTC. Please send me the model papers to my mail ganjiramji@gmail.com
In geometry, polygons with up to twelve sides have different given names; however, ______________________ if the number of sides is higher than twelve, the polygon is named by placing the suffix "gon" after the number of sides in the polygons. if the number of sides is greater than twelve, the polygon is named by placing the suffix "gon" after the number of sides in the polygons. if the number of sides is greater than twelve, name the polygon by placing the suffix "gon" after the number of sides in the polygons. if the number of sides is higher than twelve, name the polygon by placing the suffix "gon" after the number of sides in the polygons.
A is driving on a highway when the police fines him for overspeeding and exceeding the limit by 10 km/hr. At the same time B is fined for overspeeding by twice the amount by which A exceeded the limit. If he was driving at 35 km/hr what is the speed limit for the road?
27(deg) 6' 43.15" 45(deg) 31' 4.3" THEN WHAT WILL BE THE DEGREE WHEN TIME IS 3 O CLOCK
3x^2-5x+4=6, what is x?
OUT OF 111 MARBLES ONE IS NOT OF SAME WEIGHT. HOW TO FIND AND GIVE THE MIN. NO OF STEPS
Find the value of @@+25-++@16, where @ denotes "square" and + denotes "square root".
Explain the logic k=num%10; sum=sum+k; num=num/10;
Two cyclists start biking from a trail's start 3 hours apart. The second cyclist travels at 10 miles per hour and starts 3 hours after the first cyclist who is traveling at 6 miles per hour. How much time will pass before the second cyclist catches up with the first from the time the second cyclist started biking
A person wants to buy 3 paise and 5 paise stamps costing exactly one rupee. If he buys which of the following number of stamps. he wont able to buy 3 paise stamps
6 Answers 3i Infotech, Accenture, Canara Bank, CMC, Geodesic, ICICI,
3+4=25 4+5=41 5+6=?
A 16 stored building has 12000 sq.feet on each floor. Company A rents 7 floors and company B rents 4 floors. What is the number of sq.feet of unrented floor space.