the program requires 4000(n)1/2 [ie square root of n].if size of program was increased by 1% then calculate the percentage change in size of program.
No Answer is Posted For this Question
Be the First to Post Answer
the graph was given.the x and y axes were there.the line is intersecting them.the points of intersection were y=3,x=0 and x=-2,y=0.write the equation of line.
Two trains move in the same direction at 50 kmph and 32 kmph respectively. A man in the slower train observes the 15 seconds elapse before the faster train completely passes by him.
diseribe yourslef as a person. what are your strangths and weaknesses?
My flight takes of at 2am from a place at 18N 10E and landed 10 Hrs later at a place with coordinates 36N70W. What is the local time when my plane landed. a) 6:00 am b) 6:40am c)7:40 d)7:00 e)8:00
which Indian cricketer wrote the book of Tiger's tale?
There are 3 ponds and rose plant in the garden of a magician. The ponds are magical and when we put flower in it, it will double them. The magician to test his assistant sets this task. The assistant has to pluck some flowers from the rose plant and put them all in the first pond, then when they double he has to take a few flowers from the first pond and put them all in the second pond, and they are doubled in the second pond has to take a few from the second pond and put them in the third which will be doubled. The task is at the end of the activity all the ponds must have the same no of flowers. He cannot carry any flowers with him and neither can he put fresh flowers in to second or third pond. how many flowers should he pluck from the plant and how many are transfered from first to second and second to third pond?
heat loss from a surface can be minimized by?
The benefit of Privy Purses had been abolished by Government of India in the year
a hollow space on earth surface is to be fille((d) total cost of filling is rs 20000. The cost of filling per mt3 is rs 225 .how many times a size of 3 mt3 soil is required to fill the hollow space?
There is a work which can be completed by A with 12 days and B by 18 days. A and B works together for 3 days and B left. After that how many days for A to complete the work?
If a car starts from A towards B with some velocity due to some problem in the engine after travelling 30km.If the car goes with 4/5 th of its actuval velocity the car reaches B 45min later to the actual time. If the car engine fails ofter travelling 45km, the car reaches the destination B 36min late to the actual time , what is the initial velocity of car and what is the distance between A and B in km
What is the optimal size of a project team, above which additional members do not contribute productivity equivalent to the percentage increase in the staff size?