Dear Sir/ Madam, Kindly send me the model question answers for
RRB-Technician Signal(Physics/Maths) to
saranya67veena@gmail.com
No Answer is Posted For this Question
Be the First to Post Answer
A man is running around a rectangle it takes time 2 time in travelling length than travelling width total perimeter = 300. Find area.
A, B ans C are three speakers. They have to speak randomly along with another 5 speakers in a function. A has to speak before B and B has to speak before C. What is the probability.
tickets numbered 1 to 20 are mixed up and then a ticket is drawn at random. What is the probability that the ticket drawn has a number which is a multiple of 3 or 5?
Raju climbs upstairs a running escalator at 45km/hr and climbs downstairs at 95 km/hr. What is the speed of Raju when escalator is not moving?
aptitude test ,general knowledge ,copmputer knowledge,
3 Answers State Bank Of India SBI,
37.5 ? (27)1.5 x 92 = 3? (a) 5 (b) 4.5 (c) 7 (d) 6.5 (e) None of these
3 Answers Banking, BSRB, Corporation Bank, Infosys,
USA + USSR = PEACE ; P + E + A + C + E = ?
xy-x+2y = 6 equation is shifted to form equation xy=c what is c?
A 10 digit number N has none of its digits reapeating. The first two digits me N are divisible by two, the first 3 digits are divisible by 3, and the first 4 digits are divisible by 4 and so on such that the entire number is divisible by 10. find N.
There is a 5digit no. 3 pairs of sum is eleven each. Last digit is 3 times the first one. 3 rd digit is 3 less than the second. 4 th digit is 4 more than the second one. Find the digit.
On a given day, a bank had 16000 cheques returned by customers. Inspection of the first 800 cheques indicated that 100 of those 800 had errors and were therefore the available immediately for data processing. On this basis, hwo many cheques would be available immediately for data processing on that day?
6 Answers Cap Gemini, IBM, MAHINDRA, RMP Infotec, TCS,
Ben can have a piece of work done in 8 days, Joe can work three times faster than the Ben, Ram can work five times faster than Ben. How many days will they take to do the work together ?