Applying a retention date on a file will ensure that:
A. data cannot be read until the date is set.
B. data will not be deleted before that date.
C. backup copies are not retained after that date.
D. datasets having the same name are differentiated.
Answers were Sorted based on User's Feedback
Answer / guest
Answer: B
A retention date will ensure that a file cannot be
overwritten before that date has passed. The retention date
will not affect the ability to read the file. Backup copies
would be expected to have a different retention date and
therefore may well be retained after the file has been
overwritten. The creation date, not the retention date, will
differentiate files with the same name.
| Is This Answer Correct ? | 18 Yes | 0 No |
Which of the following is an implementation risk within the process of decision support systems? A. Management control B. Semistructured dimensions C. Inability to specify purpose and usage patterns D. Changes in decision processes
The database administrator has recently informed you of the decision to disable certain normalization controls in the database management system (DBMS) software to provide users with increased query performance. This will MOST likely increase the risk of: A. loss of audit trails. B. redundancy of data. C. loss of data integrity. D. unauthorized access to data.
While designing the business continuity plan (BCP) for an airline reservation system, the MOST appropriate method of data transfer/back up at an offsite location would be: A. shadow file processing. B. electronic vaulting. C. hard-disk mirroring. D. hot-site provisioning.
An IS auditor who is participating in a systems development project should: A. recommend appropriate control mechanisms regardless of cost. B. obtain and read project team meeting minutes to determine the status of the project. C. ensure that adequate and complete documentation exists for all project phases. D. not worry about his/her own ability to meet target dates since work will progress regardless.
Which of the following testing methods is MOST effective during the initial phases of prototyping? A. System B. Parallel C. Volume D. Top-down
An IS auditor should use statistical sampling and not judgmental (nonstatistical) sampling, when: A. the probability of error must be objectively quantified. B. the auditor wants to avoid sampling risk. C. generalized audit software is unavailable. D. the tolerable error rate cannot be determined.
If the decision has been made to acquire software rather than develop it internally, this decision is normally made during the: A. requirements definition phase of the project. B. feasibility study phase of the project. C. detailed design phase of the project. D. programming phase of the project.
In a risk-based audit approach, an IS auditor, in addition to risk, would be influenced by: A. the availability of CAATs. B. management's representation. C. organizational structure and job responsibilities. D. the existence of internal and operational controls
When planning an audit of a network set up, the IS auditor should give highest priority to obtaining which of the following network documentation? A. Wiring and schematic diagram B. Users list and responsibilities C. Applications list and their details D. Backup and recovery procedures
An IS auditor, in evaluating proposed biometric control devices reviews the false rejection rates (FRRs), false acceptance rates (FARs) and equal error rates (ERRs) of three different devices. The IS auditor should recommend acquiring the device having the: A. least ERR. B. most ERR. C. least FRR but most FAR. D. least FAR but most FRR.
Which of the following findings would an IS auditor be MOST concerned about when performing an audit of backup and recovery and the offsite storage vault? A. There are three individuals with a key to enter the area. B. Paper documents also are stored in the offsite vault. C. Data files, which are stored in the vault, are synchronized. D. The offsite vault is located in a separate facility.
WHICH OF THE FOLLOWING IS OFTEN AN ADVANTAGE OF USING PROTOTYPING GOR DYDTEM DVELOPMENT