After implementation of a disaster recovery plan (DRP),
pre-disaster and post-disaster operational cost for an
organization will:

A. decrease.

B. not change (remain the same).

C. increase.

D. increase or decrease depending upon nature of the business.



After implementation of a disaster recovery plan (DRP), pre-disaster and post-disaster operational ..

Answer / guest

Answer: C

There are costs associated with all activities and DRP is
not an exception. Although there are costs associated with a
DRP there are unknown costs that would be incurred if a DRP
were not implemented.

Is This Answer Correct ?    9 Yes 2 No

Post New Answer

More CISA Certification Interview Questions

Which of the following line media would provide the BEST security for a telecommunication network? A. Broad band network digital transmission B. Baseband network C. Dial-up D. Dedicated lines

1 Answers  


1. which of the following is used to achieve accountability. a.identification b. authentication c. authorization d. iniation

5 Answers  


Which of the following is a disadvantage of image processing? A. Verifies signatures B. Improves service C. Relatively inexpensive to use D. Reduces deterioration due to handling

3 Answers   Wipro,


An IS auditor reviewing database controls discovered that changes to the database during normal working hours were handled through a standard set of procedures. However, changes made after normal hours required only an abbreviated number of steps. In this situation, which of the following would be considered an adequate set of compensating controls? A. Allow changes to be made only with the DBA user account. B. Make changes to the database after granting access to a normal user account C. Use the DBA user account to make changes, log the changes and review the change log the following day. D. Use the normal user account to make changes, log the changes and review the change log the following day.

1 Answers  


The extent to which data will be collected during an IS audit should be determined, based on the: A. availability of critical and required information. B. auditor's familiarity with the circumstances. C. auditee's ability to find relevant evidence. D. purpose and scope of the audit being done.

3 Answers  


Which of the following is a role of an IS steering committee? A. Initiate computer applications. B. Ensure efficient use of data processing resources. C. Prepare and monitor system implementation plans. D. Review the performance of the systems department.

1 Answers  


Which of the following would be the LEAST important aspect of a business continuity plan? A. Redundant facilities B. Relocation procedures C. Adequate insurance coverage D. Current and available business continuity manual

1 Answers  


Which of the following is a feature of an intrusion detection system (IDS)? A. Gathering evidence on attack attempts B. Identifying weakness in the policy definition C. Blocking access to particular sites on the Internet D. Preventing certain users from accessing specific servers

1 Answers  


When performing a general controls review, an IS auditor checks the relative location of the computer room inside the building. What potential threat is the IS auditor trying to identify? A. Social engineering B. Windstorm C. Earthquake D. Flooding

1 Answers  


Which of the following concerns associated with the World Wide Web would be addressed by a firewall? A. Unauthorized access from outside the organization B. Unauthorized access from within the organization C. A delay in Internet connectivity D. A delay in downloading using file transfer protocol (FTP)

2 Answers  


A TCP/IP-based environment is exposed to the Internet. Which of the following BEST ensures that complete encryption and authentication protocols exist for protecting information while transmitted? A. Work is completed in tunnel mode with IP security using the nested services of authentication header (AH) and encapsulating security payload (ESP). B. A digital signature with RSA has been implemented. C. Digital certificates with RSA are being used. D. Work is being completed in TCP services.

2 Answers  


The risk of an IS auditor using an inadequate test procedure and concluding that material errors do not exist when, in fact, they exist is:

6 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)