Which of the following disaster recovery/continuity plan
components provides the GREATEST assurance of recovery after
a disaster?

A. The alternate facility will be available until the
original information processing facility is restored.

B. User management was involved in the identification of
critical systems and their associated critical recovery times.

C. Copies of the plan are kept at the homes of key decision
making personnel.

D. Feedback to management assuring them that the business
continuity plans are indeed workable and that the procedures
are current.



Which of the following disaster recovery/continuity plan components provides the GREATEST assurance..

Answer / guest

Answer: A

The alternate facility should be made available until the
original site is restored to provide the greatest assurance
of recovery after a disaster. Without this assurance, the
plan will not be successful. All other choices ensure
prioritization or the execution of the plan.

Is This Answer Correct ?    6 Yes 1 No

Post New Answer

More CISA Certification Interview Questions

Which of the following types of firewalls would BEST protect a network from an Internet attack? A. Screened subnet firewall B. Application filtering gateway C. Packet filtering router D. Circuit-level gateway

1 Answers  


Facilitating telecommunications continuity by providing redundant combinations of local carrier T-1 lines, microwaves and/or coaxial cables to access the local communication loop is: A. last mile circuit protection. B. long haul network diversity. C. diverse routing. D. alternative routing.

1 Answers  


Which of the following implementation modes would provide the GREATEST amount of security for outbound data connecting to the Internet? A. Transport mode with authentication header plus encapsulating security payload (ESP) B. Secure socket layer (SSL) mode C. Tunnel mode with AH plus ESP D. Triple-DES encryption mode

1 Answers  


When reviewing a system development project at the project initiation stage, an IS auditor finds that the project team is following the organization's quality manual. To meet critical deadlines the project team proposes to fast track the validation and verification processes, commencing some elements before the previous deliverable is signed off. Under these circumstances, the IS auditor would MOST likely: A. report this as a critical finding to senior management. B. accept that different quality processes can be adopted for each project. C. report to IS management the team's failure to follow quality procedures. D. report the risks associated with fast tracking to the project steering committee.

1 Answers  


The FIRST step in data classification is to: A. establish ownership. B. perform a criticality analysis. C. define access rules. D. create a data dictionary.

1 Answers  






The PRIMARY advantage of a continuous audit approach is that it: A. does not require an IS auditor to collect evidence on system reliability while processing is taking place. B. requires the IS auditor to review and follow up immediately on all information collected. C. can improve system security when used in time-sharing environments that process a large number of transactions. D. does not depend on the complexity of an organization's computer systems.

3 Answers  


An organization's disaster recovery plan should address early recovery of: A. all information systems processes. B. all financial processing applications. C. only those applications designated by the IS manager. D. processing in priority order, as defined by business management.

1 Answers  


Which of the following is the MOST effective type of antivirus software? A. Scanners B. Active monitors C. Integrity checkers D. Vaccines

2 Answers  


Prices are charged on the basis of a standard master file rate that changes as volume increases. Any exceptions must be manually approved. What is the MOST effective automated control to help ensure that all price exceptions are approved? A. All amounts are displayed back to the data entry clerk, who must verify them visually. B. Prices outside the normal range should be entered twice to verify data entry accuracy. C. The system beeps when price exceptions are entered and prints such occurrences on a report. D. A second-level password must be entered before a price exception can be processed.

1 Answers  


Which of the following audit tools is MOST useful to an IS auditor when an audit trail is required? A. Integrated test facility (ITF) B. Continuous and intermittent simulation (CIS) C. Audit hooks D. Snapshots

1 Answers  


Which of the following would be a compensating control to mitigate risks resulting from an inadequate segregation of duties? A. Sequence check B. Check digit C. Source documentation retention D. Batch control reconciliations

1 Answers  


Which of the following message services provides the strongest protection that a specific action has occurred? A. Proof of delivery B. Nonrepudiation C. Proof of submission D. Message origin authentication

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)