Which of the following is the most important element in the
design of a data warehouse?

A. Quality of the metadata

B. Speed of the transactions

C. Volatility of the data

D. Vulnerability of the system



Which of the following is the most important element in the design of a data warehouse? A. Quali..

Answer / guest

Answer: A

Quality of the metadata is the most important element in the
design of a data warehouse. A data warehouse is a copy of
transaction data specifically structured for query and
analysis. Metadata aims to provide a table of contents to
the information stored in the data warehouse. Companies that
have built warehouses believe that the metadata is the most
important component of the warehouse.

Is This Answer Correct ?    4 Yes 1 No

Post New Answer

More CISA Certification Interview Questions

When implementing continuous monitoring systems an IS auditor's first step is to identify: A. reasonable target thresholds. B. high-risk areas within the organization. C. the location and format of output files. D. applications that provide the highest potential payback.

1 Answers  


Which of the following exposures associated with the spooling of sensitive reports for offline printing would an IS auditor consider to be the MOST serious? A. Sensitive data can be read by operators. B. Data can be amended without authorization. C. Unauthorized report copies can be printed. D. Output can be lost in the event of system failure.

1 Answers  


Which of the following is widely accepted as one of the critical components in networking management? A. Configuration management B. Topological mappings C. Application of monitoring tools D. Proxy server trouble shooting

1 Answers  


Which of the following is a disadvantage of image processing? A. Verifies signatures B. Improves service C. Relatively inexpensive to use D. Reduces deterioration due to handling

3 Answers   Wipro,


An IS auditor is reviewing the change management process for an enterprise resource planning (ERP) application. Which of the following is the BEST method for testing program changes? A. Select a sample of change tickets and review them for authorization. B. Perform a walk-through by tracing a program change from start to finish. C. Trace a sample of modified programs to supporting change tickets. D. Use query software to analyze all change tickets for missing fields.

2 Answers  






The PRIMARY objective of a logical access controls review is to: A. review access controls provided through software. B. ensure access is granted per the organization's authorities. C. walkthrough and assess access provided in the IT environment. D. provide assurance that computer hardware is protected adequately against abuse.

1 Answers  


As a result of a business process reengineering (BPR) project: A. an IS auditor would be concerned with the key controls that existed in the prior business process and not those in the new process. B. system processes are automated in such a way that there are more manual interventions and manual controls. C. the newly designed business processes usually do not involve changes in the way(s) of doing business. D. advantages usually are realized when the reengineering process appropriately suits the business and risk.

1 Answers  


A large chain of shops with EFT at point-of-sale devices has a central communications processor for connecting to the banking network. Which of the following is the BEST disaster recovery plan for the communications processor? A. Offsite storage of daily backups B. Alternative standby processor onsite C. Installation of duplex communication links D. Alternative standby processor at another network node

1 Answers  


Which of the following pairs of functions should not be combined to provide proper segregation of duties? A. Tape librarian and computer operator B. Application programming and data entry C. Systems analyst and database administrator D. Security administrator and quality assurance

3 Answers  


The reason for having controls in an IS environment: A. remains unchanged from a manual environment, but the implemented control features may be different. B. changes from a manual environment, therefore the implemented control features may be different. C. changes from a manual environment, but the implemented control features will be the same. D. remains unchanged from a manual environment and the implemented control features will also be the same.

2 Answers  


In a LAN environment, which of the following minimizes the risk of data corruption during transmission? A. Using end-to-end encryption for data communication B. Using separate conduits for electrical and data cables C. Using check sums for checking the corruption of data D. Connecting the terminals using a star topology

1 Answers  


In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)