Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Which of the following can be used to verify output results
and control totals by matching them against the input data
and control totals?

A. Batch header forms

B. Batch balancing

C. Data conversion error corrections

D. Access controls over print spools



Which of the following can be used to verify output results and control totals by matching them aga..

Answer / guest

Answer: B

"Batch balancing is used to verify output results and
control totals by matching them against the input data and
control totals. Batch header forms control data preparation

data conversion error corrections correct errors that occur
due to duplication of transactions and inaccurate data entry

and access controls over print spools prevent reports from
being accidentally deleted form print spools or directed to
a different printer."

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

In which of the following phases of the system development life cycle (SDLC) is it the MOST important for the IS auditor to participate? A. Design B. Testing C. Programming D. Implementation

1 Answers  


The initial step in establishing an information security program is the: A. development and implementation of an information security standards manual. B. performance of a comprehensive security control review by the IS auditor. C. adoption of a corporate information security policy statement. D. purchase of security access control software.

2 Answers  


During which phase of a system development process should an IS auditor first raise the issue of application controls? A. Construction B. System design C. Acceptance testing D. Functional specification

1 Answers  


When selecting software, which of the following business and technical issues is the MOST important to be considered? A. Vendor reputation B. Requirements of the organization C. Cost factors D. Installed base

1 Answers  


Which of the following types of risks assumes an absence of compensating controls in the area being reviewed? A. Control risk B. Detection risk C. Inherent risk D. Sampling risk

1 Answers  


The development of an IS security policy is ultimately the responsibility of the: A. IS department. B. security committee. C. security administrator. D. board of directors.

1 Answers  


After implementation of a disaster recovery plan (DRP), pre-disaster and post-disaster operational cost for an organization will: A. decrease. B. not change (remain the same). C. increase. D. increase or decrease depending upon nature of the business.

1 Answers  


LANs: A. protect against virus infection. B. protect against improper disclosure of data. C. provide program integrity from unauthorized changes. D. provide central storage for a group of users.

1 Answers  


Which of the following would be a compensating control to mitigate risks resulting from an inadequate segregation of duties? A. Sequence check B. Check digit C. Source documentation retention D. Batch control reconciliations

1 Answers  


Which of the following would be the BEST method for ensuring that critical fields in a master record have been updated properly? A. Field checks B. Control totals C. Reasonableness checks D. A before-and-after maintenance report

2 Answers  


If inadequate, which of the following would be the MOST likely contributor to a denial-of-service attack? A. Router configuration and rules B. Design of the internal network C. Updates to the router system software D. Audit testing and review techniques

2 Answers  


Which of the following is necessary to have FIRST in the development of a business continuity plan? A. Risk-based classification of systems B. Inventory of all assets C. Complete documentation of all disasters D. Availability of hardware and software

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)