Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Which of the following would an IS auditor consider to be
the MOST helpful when evaluating the effectiveness and
adequacy of a computer preventive maintenance program?

A. A system downtime log

B. Vendors' reliability figures

C. Regularly scheduled maintenance log

D. A written preventive maintenance schedule



Which of the following would an IS auditor consider to be the MOST helpful when evaluating the effe..

Answer / guest

Answer: A

A system downtime log provides information regarding the
effectiveness and adequacy of computer preventive
maintenance programs.

Is This Answer Correct ?    7 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

The reliability of an application system's audit trail may be questionable if: A. user IDs are recorded in the audit trail. B. the security administrator has read-only rights to the audit file. C. date time stamps record when an action occurs. D. users can amend audit trail records when correcting system errors.

2 Answers  


In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.

1 Answers  


After implementation of a disaster recovery plan (DRP), pre-disaster and post-disaster operational cost for an organization will: A. decrease. B. not change (remain the same). C. increase. D. increase or decrease depending upon nature of the business.

1 Answers  


Naming conventions for system resources are important for access control because they: A. ensure that resource names are not ambiguous. B. reduce the number of rules required to adequately protect resources. C. ensure that user access to resources is clearly and uniquely identified. D. ensure that internationally recognized names are used to protect resources.

1 Answers  


An IS auditor is reviewing the change management process for an enterprise resource planning (ERP) application. Which of the following is the BEST method for testing program changes? A. Select a sample of change tickets and review them for authorization. B. Perform a walk-through by tracing a program change from start to finish. C. Trace a sample of modified programs to supporting change tickets. D. Use query software to analyze all change tickets for missing fields.

2 Answers  


During the review of an organization's disaster recovery and business continuity plan, the IS auditor found that a paper test was performed to verify the existence of all necessary procedures and actions within the recovery plan. This is a: A. preparedness test. B. module test. C. full test. D. walk-through test.

1 Answers  


The device that connects two networks at the highest level of the ISO-OSI framework ( i.e., application layer) is a A. Gateway B. Router C. Bridge D. Brouter

1 Answers  


The editing/validation of data entered at a remote site would be performed MOST effectively at the: A. central processing site after running the application system. B. central processing site during the running of the application system. C. remote processing site after transmission to the central processing site. D. remote processing site prior to transmission of the data to the central processing site.

1 Answers  


A request for a change to a report format in a module (subsystem) was made. After making the required changes, the programmer should carry out: A. unit testing. B. unit and module testing. C. unit, module and regression testing. D. module testing.

2 Answers  


In a system that records all receivables for a company, the receivables are posted on a daily basis. Which of the following would ensure that receivables balances are unaltered between postings? A. Range checks B. Record counts C. Sequence checking D. Run-to-run control totals

2 Answers  


Which of the following findings would an IS auditor be MOST concerned about when performing an audit of backup and recovery and the offsite storage vault? A. There are three individuals with a key to enter the area. B. Paper documents also are stored in the offsite vault. C. Data files, which are stored in the vault, are synchronized. D. The offsite vault is located in a separate facility.

1 Answers   Apple,


Which of the following would not prevent the loss of an asset but would assist in recovery by transferring part of the risk to a third party? A. Full system backups B. Insurance C. Testing D. Business impact analysis

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)