The MOST significant level of effort for business continuity
planning (BCP) generally is required during the:

A. testing stage.

B. evaluation stage.

C. maintenance stage.

D. early stages of planning.

Answers were Sorted based on User's Feedback



The MOST significant level of effort for business continuity planning (BCP) generally is required d..

Answer / guest

Answer: D

A company in the early stages of a BCP will incur the most
significant level of program development effort, which will
level out as the BCP moves into maintenance, testing and
evaluation stages. It is during the planning stage that an
IS auditor will play an important role in obtaining senior
management's commitment to resources and assignment of BCP
responsibilities.

Is This Answer Correct ?    10 Yes 0 No

The MOST significant level of effort for business continuity planning (BCP) generally is required d..

Answer / aravind

Answer is D

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Confidential data stored on a laptop is BEST protected by: A. storage on optical disks. B. logon ID and password. C. data encryption. D. physical locks.

1 Answers  


An IS auditor's MAJOR concern as a result of reviewing a business process reengineering (BPR) project should be whether the: A. newly designed business process has key controls in place. B. changed process will affect organization structure, finances and personnel. C. roles for suppliers have been redefined. D. process has been documented before and after reengineering.

1 Answers  


Which of the following concerns associated with the World Wide Web would be addressed by a firewall? A. Unauthorized access from outside the organization B. Unauthorized access from within the organization C. A delay in Internet connectivity D. A delay in downloading using file transfer protocol (FTP)

1 Answers  


Which of the following types of data validation editing checks is used to determine if a field contains data, and not zeros or blanks? A. Check digit B. Existence check C. Completeness check D. Reasonableness check

1 Answers   CISA,


The PRIMARY purpose of compliance tests is to verify whether: A. controls are implemented as prescribed. B. documentation is accurate and current. C. access to users is provided as specified. D. data validation procedures are provided.

1 Answers  






With regard to sampling it can be said that: A. sampling is generally applicable when the population relates to an intangible or undocumented control. B. if an auditor knows internal controls are strong, the confidence coefficient may be lowered. C. attribute sampling would help prevent excessive sampling of an attribute by stopping an audit test at the earliest possible moment. D. variable sampling is a technique to estimate the rate of occurrence of a given control or set of related controls.

1 Answers  


A company uses a bank to process its weekly payroll. Time sheets and payroll adjustment forms (e.g., hourly rate changes, terminations) are completed and delivered to the bank, which prepares checks (cheques) and reports for distribution. To BEST ensure payroll data accuracy: A. payroll reports should be compared to input forms. B. gross payroll should be recalculated manually. C. checks (cheques) should be compared to input forms. D. checks (cheques) should be reconciled with output reports.

1 Answers  


A MAJOR risk of using single sign-on (SSO) is that it: A. has a single authentication point. B. represents a single point of failure. C. causes an administrative bottleneck. D. leads to a lockout of valid users.

1 Answers  


In a LAN environment, which of the following minimizes the risk of data corruption during transmission? A. Using end-to-end encryption for data communication B. Using separate conduits for electrical and data cables C. Using check sums for checking the corruption of data D. Connecting the terminals using a star topology

1 Answers  


Which of the following is a control to compensate for a programmer having access to accounts payable production data? A. Processing controls such as range checks and logic edits B. Reviewing accounts payable output reports by data entry C. Reviewing system-produced reports for checks (cheques) over a stated amount D. Having the accounts payable supervisor match all checks (cheques) to approved invoices

1 Answers  


When planning an audit of a network set up, the IS auditor should give highest priority to obtaining which of the following network documentation? A. Wiring and schematic diagram B. Users list and responsibilities C. Applications list and their details D. Backup and recovery procedures

1 Answers  


An IS auditor who is participating in a systems development project should: A. recommend appropriate control mechanisms regardless of cost. B. obtain and read project team meeting minutes to determine the status of the project. C. ensure that adequate and complete documentation exists for all project phases. D. not worry about his/her own ability to meet target dates since work will progress regardless.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)