what modification we need to do in jcl if we use sort in cobol? I mean whether we need to include temporary file used for sorting in assign statement?
1 233101 GROSS-PAY 05 BASIC-PAY PIC 9(5) 05 ALLOWENCES PIC 9(3) if BASIC-PAY has a value 1000 and ALLOWENCES has a value of 250,what will be displayed by the statement DISPLAY GROSS-PAY a.1250 b.01000250 c.01250 d.1.250
1 2299WORKING-STORAGE SECTION. 01 GROSS-PAY. 05 BASIC-PAY PIC 9(5). 05 ALLOWENCES PIC 9(3). PROCEDURE DIVISION. MOVE 1000 TO BASIC-PAY. MOVE 250 TO ALLOWENCES. DISPLAY GROSS-PAY. STOP RUN. 77 W-A PIC 9(3)V99 VALUE 23.75 77 W-B PIC ZZ9V99 VLAUE 123.45 after the statement MOVE W-A TO W-B what will be W-B's value? a.123.75 b.b23.75 (where b indicates space) c.023.75 d.invalid move
1358WORKING-STORAGE SECTION. 77 W-A PIC 9(3)V99 VALUE 23.75. 77 W-B PIC ZZ9V99 VALUE 123.45. PROCEDURE DIVISION. MOVE W-A TO W-B. DISPLAY W-B. STOP RUN. compiler : IGYGR1080-S A "VALUE" clause literal was not compatible with the data category o subject data item. The "VALUE" clause was discarded. WORKING-STORAGE SECTION. 77 W-A PIC 9(3)V99 VALUE 23.75. 77 W-B PIC ZZ9V99. PROCEDURE DIVISION. MOVE 123.45 TO W-B. MOVE W-A TO W-B. DISPLAY W-B. STOP RUN. 2375
1476what if any ,is the syntax error in the following piece of code 01 B PIC A(7) 02 C PIC 9(4) ........ IF(B NUMERIC) ADD 10 TO C a.the condition in the if statement is wrong b.noting is wrong c.because C is initialised.ADD 10 TO C is wrong d.both B and C shoud have same size.
1 286401 GROUP-ITEM 05 AMOUNT-1 PIC 99V9 USAGE COMP VALUE 50 05 AMOUNT-2 PIC 9(4)V99 USAGE COMP MOVE ZERO TO GROUP-ITEM ADD 50 TO AMOUNT-1 what will be the content of AMOUNT-1? a.50 b.100 c.0 d.unpredictable
1 2213WORKING-STORAGE SECTION. 1 GROUP-ITEM. 05 AMOUNT-1 PIC 99V9 USAGE COMP VALUE 50. 05 AMOUNT-2 PIC 9(4)V99 USAGE COMP. PROCEDURE DIVISION. MOVE ZERO TO GROUP-ITEM. ADD 50 TO AMOUNT-1. DISPLAY AMOUNT-1. STOP RUN.
1 2185consider the following progrm statements MOVE 0 TO SW.NO.OF.REC PERFORM PRI-OUT UNTIL SW=1 DISPALY NO.OF.REC STOP RUN PRE-OUT READ IN-FILE AT END MOVE 1 TO SW WRITE OUO-REC FROM IN-REC ADD 1 TO NO.OF REC if the IN-FILE contains 1000 records what value will be displayed after the PERFORM is over? assume that N0.OF.REC has PIC 9(4) a.1000 b.1001 c.1 d.none of the above
1 2450//S10 EXEC PGM=ICETOOL //TOOLMSG DD SYSOUT=* //DFSMSG DD SYSOUT=* //CON DD DSN=VAR.INPUT1,DISP=SHR // DD DSN=VAR.INPUT2,DISP=SHR //OUT DD DSN=VAR.OUTPUT,DISP=(NEW,CATLG,DELETE), // SPACE=(CYL,(5,5)),UNIT=SYSDA //TOOLIN DD * * Splice the needed data from the two VB files together SPLICE FROM(CON) TO(OUT) ON(5,5,CH) WITHALL - WITH(12,5) WITH(22,20) VLENMAX /*
1458
How to execute 2nd and 4th steps among 5 steps in jcl proc?
Explain how can an in-stream dataset be terminated?
I need exexution process for JCL programs
I have a job called careerride and some steps in it as step1,step2. But I want to execute step2 before step1 ? How do I do that?
What do you understand by the term job time – out and how can you overcome that?
Mainframes gets a text file that contains the name of the file. Now using JCL i want to locate that file name in the mainframe system and perform further processing. Please tell how to proceed
What do you know about jcl?
In job processing, what happens in conversion stage?
what happens when COND is coded in JOB statement and when COND is coded inside EXEC statement?
Is there any command to check wether the ps file is in sorted order?
Explain in DD statement what is the use of DCB parameter?
What happens if both JOBLIB & STEPLIB is specified ?
How can an in-stream dataset be terminated?
When you specify multiple datasets in a JOBLIB or STEPLIB, what factor determines the order?
How jcl is used for testing batch programs?