Post New Techno Electric and Engineering Electrical Engineering Interview Questions
You are the project manager for a construction company that is building a new city and county office building in your city. Your CCB recently approved a scope change. You know that scope change might come about as a result of all of the following except: A. Schedule revisions B. Product scope change C. Changes to the agreed-upon WBS D. Changes to the project requirements
What was microsoft's first operating system?
Addition to previous section relative word 5th one was Putrid ans: rotten, also there was prob. in 1st section on bucket weight ans:10kg, also there was a prob. on train speed to find bridge length ans:800 mtrs.
what is exact time to study dcs and plc cources
What is an endless loop?
What do you mean by ttu in teradata?
Does office pro plus include access?
Write down the syntax of "for " loop
What is java server faces (jsf)?
placement papaers of spring computing technology
What is api in django?
There are n points and each point enclose with x and y axis form a rectangle and find the point using a program which forms the smallest rectangle?
What is the difference between data blending and join?
If I replace my Sqlserver with XML files and how about handling the same ?
What is csrf mvc?