Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • CA aptitute test questions (1)
  • CA interview questions (87)
  • CA placement papers (1)
  • CA technical test questions (20)



CA QTP Interview Questions
Questions Answers Views Company eMail

give me descriptive programing code sample flight application in qtp?

8 23575

Could any one explain about the nested actions in QTP? This question is asked by Qualitree and CA

3 8402

write script for bitmap image?

851

Post New CA QTP Interview Questions



Un-Answered Questions

Can we convert off line transformer to on line transformer

778


Describe your sales experience.

770


what do u understand about FACTS? how they are useful?

784


we have received TDS Certificate (Form No 16A) from one company, we have checked online credited but they not credited to us (online credit)..how can i refund that amount. pls send us letter format

4547


what is the objective of business taxation in private company?

1290






Difference between depreciation according to cost principle and matching principle

829


a)In a 3-phase 4-wire circuit, a circuit breaker is selected to protect the circuit whose highest fault level is 6.6 MVA. Determine the required minimum breaking capacity in kA. (Note: Covert 3-phase power in terms of kA to find answer.) b)Using the below, determine the required minimum making capacity in kA as a “peak value”. Rate breaking capacity (Icn) ka: Icn<= 1.5 Factor = 1.41 1.5

489


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

869


 What is used for tracking uncertain events? a) Filtering algorithm b) Sensors c) Actuators d) None of the mentioned

832


what is diff bet ref variable & instance of class

854


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

1565


Tell me about how you have left a position better than you found it

821


What are the key fields in MRP views?

514


in transfer funds module, how you come to know that amount has been transferred successfully or not....explain in detail

407


How does a token ring network work ? In what way is it different from Ethernet ?

341






CA QTP Interview Questions
  • OOPS (1)
  • C++ General (8)
  • VC++ AllOther (1)
  • TCP IP (1)
  • Networking AllOther (1)
  • C Sharp (1)
  • ASP.NET (1)
  • Oracle General (1)
  • Oracle AllOther (1)
  • SQL Server (1)
  • SDK (1)
  • Linux AllOther (1)
  • Operating Systems General Concepts (2)
  • WinRunner (3)
  • Load Runner (1)
  • QTP (3)
  • Manual Testing (7)
  • DB2 (1)
  • Advanced Java (1)
  • Struts (1)
  • Web Related AllOther (1)
  • Business Objects (2)
  • Theoritical (4)
  • SAP Basis (1)
  • SAP FI CO (4)
  • Requirement Management (7)
  • Risk Analysis (3)
  • Estimation Analysis (4)
  • Planning & Integration (7)
  • Software Quality Analysis (5)
  • Software Integration & Release (3)
  • Electrical Engineering (2)
  • Electronics Communications (1)
  • Banking Finance (2)
  • Audit (2)
  • Taxation (5)
  • Accounting General (6)
  • Accounting AllOther (9)
  • Law AllOther (1)
  • Placement Papers (1)
  • SQLServer Errors (1)