Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Brigade aptitute test questions (1)
  • Brigade interview questions (51)
  • Brigade technical test questions (10)



Brigade Windows AllOther Interview Questions
Questions Answers Views Company eMail

What are FSMO Roles? List them

10 60549

What are the features of windows Vista?

10 10930

What are the features of Windows XP?

34 110242

Post New Brigade Windows AllOther Interview Questions



Un-Answered Questions

How to resolve deadlock issue

10154


What is Test Script Planner

848


How can you construct both PMOS and NMOS on a single substrate?

3158


what is surge and how is it prevented, what is the purpose of bypass valve across AS valve.

786


what is a code in vb amount display in words

695






CAN AUNIVERSE BE LINKED TO MORE THAN ONE DATASOURCE?

872


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

733


plese send me the oces/dgfs sylabus and previous year question pattern of electrical engg.?

1087


what is the configuration of catologuecontent management & briefly tell about LDAP?

1673


How to Get current record from a TDBGrid ?

2007


Why we are using propyl parabben in methanol in calibration of hplc for GPV test??

954


can i use ups power as a raw power for another ups

650


Dear sir, By which formula u can calculate for a particular kv line there is a range of mw.

857


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

673


what is the calculation method to design core and winding of a 200kva 3phase distribution transformer?

1253






Brigade Windows AllOther Interview Questions
  • SNMP (2)
  • SQL Server (1)
  • Windows AllOther (3)
  • BlueTooth (1)
  • Civil Engineering (8)
  • Electrical Engineering (1)
  • Marketing Sales (1)
  • Banking Finance (8)
  • Human Resources (1)
  • CompanyAffairs CS (2)
  • Accounting AllOther (6)
  • Call Centre AllOther (23)
  • Everything Else AllOther (2)
  • English (1)
  • CCNA (1)
  • Microsoft Certifications (1)