how the CT and PT is connected in the circuit during testing of transformer explain with diagram
2011What is the maximum allowed kwa through 2.5mm cable. Electric company installed 2 electric meter at my premises . Two jumper wires of 2.5 mm are used to connect . 2 single phase meters with allowable load 6 and 3 kwa. These jumper wires are taken from a 3 phase electric meter. Meters are in open Sun. What max load these wires can take.
2162Post New KESC Interview Questions
Name the authority that mint coins in india and also name the places where the minting operation is processed?
How to avoid using cursors?
Can you change a master page dynamically at runtime? How?
What are the different bindings supported by wcf?
How is consistency maintained by Stateful Session through transaction updates ?
How to use "startup" command to start default instance?
What is starvation?
While entering a series of numbers I was manually entering a comma. Excel auto-formatted the field to accommodate the comma like 1,200. I erroneously entered12,00. Obviously the comma was placed in the incorrect position, but excel interpreted this as text. When I wrote my sum formula, the results were not as expected.how can this be avoided in the future?
how to move the records from file to array table. give with code example
How do I get my windows start menu back?
Where do you check transport request logs?
WHAT IS THE MEANING OF BALANCED / UNBALANCED IN STABILIZER TYPES.
Which rpa provides an open platform for automation?
How can I display more toolbars in ms word?
Do you need to be an apprentice for mechanical engineering?