Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Atos Origin aptitute test questions (1)
  • Atos Origin interview questions (50)
  • Atos Origin technical test questions (3)



Atos Origin SAP B1 Interview Questions
Questions Answers Views Company eMail

what is report to report interface and why we use it sap bi

1 4957

Post New Atos Origin SAP B1 Interview Questions



Un-Answered Questions

Hi can you please help for the following. I have a ASP.Net web page I want to print the whole page how is it possible? I want It in ASP also.Please send me the solutions dipankar.hazari@gmail.com . Thanks in advance.

1507


pls send me the placement papers and anyother useful information to sureshec127@gmail.com. STREAM: ELECTRONICS AND COMMUNICATION

735


Can RCD's used to protect the VVVF drive if not why.

1021


how to find the fault in smps if i am not getting the output

630


is anybody attended interview in ernst&young for EMS PROCESS , pls let me know abt the written test and what type of report writing

855






Diffrence b/w functional testing,functionality testing,system testing?

936


1. How many TRXs are supported in Nokia Metrosite 2. What is the command to lock the TRX 3. What is the command to unlock the BTS 4. What is the command from BSC to check the alarm in BTS 5. What is the maximum transmit power of FlexiEdge BTS 6. When Abis link is down, name the alarm that is generated at BSC 7. Orange LED on RRI card is glowing – what is the indication? 8. How many E1s are supported by one E1 card in BTS 9. How many ways one can login to BIO card? 10. What are the different data rates in Abis for Traffic, TRX signaling and OMU 11. BCSU card in BSC can support how many TRXs? 12. What is the command to check list of sites that are down? 13. How many TRX are supported when we use one M2HA card in BTS? 14. Name the different types of power supply card in BTS and the output power of each card 15. Ater interface is between transcoder and MSC – True/False 16. SS7 signaling is used in Abis interface – True/False 17. FlexiEdge BTS has RRI card – True/False 18. From Transcoder to MSC, data rate for each call is 64Kbps – True/false 19. Name different types of TRXs which supports different GSM bands 20. ODU LED shows orange – what is the significance?

2592


Assignment A software house got a project to automate sales/purchase department of a furniture store. The store management is clearly transferred their requirements to the software house management. There is no chance of changing the requirements afterwards. Software house management use waterfall process model to make the project. Given is the progress flow of water-fall process model In waterfall process model, the deliverable (document) produced in one phase serves as an input to the next phase. Suppose you are a project manager who is leading this project. It is decided to work and complete the project using waterfall process model approach. You are required to develop a plan in which the key task is to decide the deliverable that should be built during and after completion of each phase. Also give a description or required contents that must be included in those deliverables. You are not supposed to make the complete project. All you are required to do is to make a Project plan. In that, you need to give a set of deliverables (documents) which according to you, should be developed in each of the phase (Requirements, Designing, implementation, Testing, Maintenance). Also provide contents which should be there in each deliverable. The contents should be clear and have brief explanation. Note:: There are one folder and one file in the attached folder. The file is named as Assignment 4 write-up which is your assignment write-up. The other folder named Project deliverables is the folder in which you are required to organize and place your deliverables. Name of the document/deliverable saved in each folder should be mentioned in the file named checklist (This file is placed in the “Project deliverables” folder) For Example If you produce a deliverable named Requirement Specification (RS) in the “Requirements” phase. You need to do following tasks 1) Finalize the RS contents 2) Save the file in sub-folder named Requirements 3) Write the name of this document in the checklist file under the heading Requirements. Similarly, you need to make and save deliverables of each phase. Not all phases contain one deliverable. There must be some phases having more than one deliverables. PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ? CHECKLIST ARE: 1-Requirements 2- Designing 3- Implementation 4- Testing 5- Maintenance

5405


What are the types of line styles available in Treeview Control?

1279


am from coimbatore.am learning php&mysql. what will be the approx salary for me if i get a job in coimbatore.

973


Explain the DH5alpha transformation ?

1197


Does the BDE use Client side or server side cursors for MSSQL?

968


What is special procurement & tell one special procurement briefly

644


If anybody have the ref. design book of the 3 point cylindrical rolling with sheet thickness of 2.3 mm & 67 mm internal diameter legth of 80 mm

692


Anyone have any idea when to conduct Uniformity of Weight (UOW) and when need to conduct Uniformity of Dosage Units (UOD) or when need both? I read BP it only said if average weight < or = 0.04g then just conduct UOD, no need UOW. Under UOD section, it doesnt say when need to conduct UOD but just said UOD got two type, one is Mass Variation (MV), another is Content Uniformity (CU) and under what conditions to conduct them. For USP, no UOW section, only got UOD section.

1484






Atos Origin SAP B1 Interview Questions
  • MFC (1)
  • ASP.NET (1)
  • Crystal Reports (1)
  • Databases AllOther (1)
  • Unix Commands (1)
  • Unix AllOther (1)
  • Solaris Commands (1)
  • QTP (1)
  • Manual Testing (1)
  • Tomcat (1)
  • COBOL (1)
  • DB2 (1)
  • Core Java (1)
  • Struts (1)
  • Cognos (1)
  • Informatica (2)
  • Crystal Enterprise Suite (1)
  • SAP Basis (3)
  • SAP ABAP (16)
  • SAP SD (4)
  • SAP MM (1)
  • SAP FI CO (1)
  • SAP CRM (1)
  • SAP Security (3)
  • SAP ALE IDocs (1)
  • SAP B1 (1)
  • ERP General (1)
  • TIBCO (1)
  • Call Centre AllOther (1)
  • General Aptitude (1)
  • CAT (1)