Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

  • Ashok Leyland aptitute test questions (2)
  • Ashok Leyland interview questions (33)
  • Ashok Leyland placement papers (1)
  • Ashok Leyland technical test questions (1)



Ashok Leyland Interview Questions
Questions Answers Views Company eMail

Who is responsible to collect the service tax?

12 20771

Post New Ashok Leyland Interview Questions



Un-Answered Questions

hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.

1521


Write a program that prints the numbers from 1 to 100. But for multiples of three print "Fit" instead of the number and for the multiples of five print "Bit". For numbers which are multiples of both three and five print "FitBit".

919


Hi, here r some questions, which were asked in Ekaplus, plz process these questions. 1. How we connect with the version?

2610


how to search instance through serial-no?

807


How can I get know that my pc contains dram or sram..?

690






Fire Engine should be stopped in auto mode or not. If stopped then why and if not then why not?

809


What is the use of string function substr(string,position,max) in AWK?

278


FROM WHERE I WILL GET PREVIOUS QUESTION PAPER OF JUNIOR ACCOUNTS OFFICER TEST OF B S N L

1826


A 400 V, 50 Hz, Δ connected synchronous generator has a field reactance of 0.1 Ω and armature resistance of 0.015 Ω. At full load, the machine supplies 1200 A at 0.8 pf lagging. Under full-load conditions, the friction and windage losses are 40 KW and the core losses are 30 KW. What is the machine’s overall efficiency? Ignore any field circuit losses.

365


What is the process to change the files at arbitrary locations in HDFS?

435


 What areas of your organization need to be involved in the install process?

226


We are designer please help me calculate the size of 11kv cables from step up transformer to M.V panel, total load is 5 mega watt distance 900 feet (used aluminum type cables) please provided formula for calculate the cable with example.

450


Sir, In the current session I am attending the Junior Engineer Exam in Grade II for Mechanical Engineering. If it possible. Please sent the Past Exams Question on my mail. It is so useful use to me.

1001


Hi there Does anybody can respond to my Questions? Is some one there to answer my Questions posted in Software testing category.pls E-mail to sunitht27@yahoo.com

948


in a VB application, where the data will be stored after manipulation? what is the syntax for that?

1068






Ashok Leyland Interview Questions
  • Advanced Java (1)
  • SAP Basis (1)
  • Civil Engineering (4)
  • Mechanical Engineering (6)
  • Electrical Engineering (8)
  • Automobile Engineering (8)
  • Banking Finance (1)
  • Human Resources (3)
  • Taxation (1)
  • Accounting AllOther (2)
  • SSC Economy (1)
  • General Aptitude (1)