As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
2 5714Post New Infotech Civil Engineering Interview Questions
What is session in http request?
What is scan table/view and seek table/view when its occurs? : sql server database administration
We have received supplies of the ordered material. payments against the supplies also released. Where ST paid 4% against form C. Meanwhile it has been observed that 25% of material supplied was defective. Please suggest whether the issuance of C form from our side would be stopped till settlement of liabilities.
What are modalities?
How do I call one controller's methods from a different controller?
What is difference between value and reference types in C#.NET
What are the different recovery mechanism that can be used in failed jobs?
What is open loop and control loop systems?
what is automation testing process? What are the main steps invloved in it?
What is tristor?
“we know what it takes to be a tiger †in this punch line of accenture what is the link between “tiger†and “High performance delivered�
Do wordpress blogs show up google?
What is the indirect allocation method of postings in co? : co- cost center accounting
What are the distinctive parts where the internet of things can really enhance the present procedures?
what is means of sap