I have sample questions for QUANTITATIVE APTITUDE for bank
test. Those who want this can contact me :
beenasbi@gmail.com

Answer Posted / raghava

please send me that questions to this mail:
veera.rr@gmail.com

Is This Answer Correct ?    17 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

One clock rings 7 O'clock in 7 sec.In how many seconds it will ring 10 O'clock.

702


A can do a work in 8 days, B can do a work in 7 days, C can do a work in 6 days. A works on the first day, B works on the second day and C on the third day rely. that is they work on alternate days. When will they finish the work.(which day will they finish the work) (7+7/168)

727


I HAVE APPLIED FOR RRB-CHENNAI(ECRC,GOODS GUARD).SO I NEED ECRC ALL PREVIOUS YEAR QUESTION SOLVED PAPER..PLS SEND IT TO ramya.raj@hotmail.com

3562


In a class photograph, 5 girls are sitting in the front where as 20 boys are standing behind them. The corner two positions are reserved for the tallest boys of the class. What are the number of ways the students may be arranged?

675


in 80 coins one coin is counterfiet what is minimum number of weighings to find out counterfiet coin

847






Hi friends i am new to this site. Pls provide me the KVB clerical exam model question papers. pls send to mail id mailstoaaa@gmail.com. Hope u guys will help me.

1742


cgl2010 tier 2 ki merit kya rhgi

1761


two trains are 2 kms apart. Speed of one train is 20m/s and the other train is running at 30 m/s. Lengths of the trains are 200 and 300m. In how much time do the trains cross each other?

747


epaulette : shoulder :: tiara :

784


Asian paints takes a contracts to paint 3 houses. Mr. White can paint a house in 6 days while Mr.Blue would take 8 days and Mr.Red 12 days. After 8 days Mr.White goes on a holiday and Mr. Blue begins to work for a period of 6 days. How many days will it take Mr.Red to complete the work?

719


Grass in lawn grows equally thick and in a uniform rate. It takes 24 days for 70 cows and 60 for 30 cows . How many cows can eat away the same in 96 days.?

747


A power unit is there by the bank of the river of 750 meters width. A cable is made from power unit to power a plant opposite to that of the river and 1500mts away from the power unit. The cost of the cable below water is Rs. 15/- per meter and cost of cable on the bank is Rs.12/- per meter. Find the total of laying the cable.

824


Scientific publishing aptitude interview question

996


In school there are some bicycles and 4 wheeler wagons. One tuesday there are 190 wheels in the campus. How many bicycles are there?

2304


A train 100 meter long takes 3 second to cross a man walking at the rate of 6km/hr in a direction opposite to that of the train. Find the speed of the train.

861