Product Costing Run is over. Now If I add one more
rawmaterial for that material also it has to included & run
the cost. But it is not happening?
Answer Posted / sravan
cost estimate is done in CK11N but usually this will be
updated once in a month. or we have to reverse the cost
estimate for the current month and run it again.
| Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What are the production process in sap?
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
What is planning horizon?
How does sap know that an operation has components as indicated by the component allocation indicator?
What do we do in the realization phase?
What are all the steps involved in Variant Configuration?
What is the use of mrp pp evaluations?
In cost controlling information system mention the fields that are listed in the list screen of the report?
Define gaps.
Explain the gaps and the steps involved in them.
What general data appears on basic data screen?
What is mrp controller means?
How costing is affected the pp?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?