what is controlling area, cost center, cost element,internal
order & profit center?what does it control?what is
relationship between each other?

Answer Posted / chandu

hi,

controling area means, it is individual area which we find
out the actual costs and incomes, based on this information
we can decide whether we hav to control costs and incomes
from the tht area. area means productr services.

cost center indicate of actual cost of the product to
produced r to get. it is part of controling of costs.

internal order means to get the raw meterial from the
godown to the production area, we hav to cofigure steps to
posting data raw meterial like meterial type, cost, etc.

profit center indicate the actual profit of each product r
serves.

these are inter related with each other. these are used to
find the actual cost incured and incomes gained. based on
this we can control the cost of producing products.

this information as of my knowledge, if der is any wrong,
pls ignore, then send me right answer to my id:
dearchandhu@gmail.com

Is This Answer Correct ?    14 Yes 19 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which is the payment term which actually gets defaulted when the transaction is posted for the customer (accounting view or the sales view)?

681


What is a posting period and how does the system identifies posting period?

669


What are the steps to be taken before you execute an actual costing run?

575


Is it possible to calculate the planned activity output through system?

689


How to FI integrate with MM and SD.

1885






How capital wip (work in process) and assets accounted for in sap?

749


Difference between structure and unstructured in MT940 In Bank reconciliation statement?

3505


Can we post less amount through standard payment?. how?

1529


Why it is necessary to block an asset master record? : fi- asset accounting

686


How does partial payment differ from residual payment? : fi- accounts receivable

712


Change of General Ledger Cost Assignment :- We have two major company codes and plus a minor one. In order to assign intra and inter company costs correctly SAP was set up to assign cost at goods issue to the general ledger account 100000 according to plant. Now we combined two company code into one. Every end of month we must re-class costs out of the plant cost center into the cost center associated with the sales office. It is possible that we directly assign cost to cost center of cost office, how can it be possible? Please tell me how we can make this process easier. Thanks in advance, Manoj

1665


What is application packaging in SAP FICO

2325


Hi in normal Senario when we do any sale we put the signature if the supplier,and the one who has prepared it,etc.then in SAP can u say me as to how we will incorporate this in SAP.

2014


Difference between depreciation ,accumulated depreciation and apc?

649


What is an activity type? : co- cost center accounting

643