Product Costing Run is over. Now If I add one more
rawmaterial for that material also it has to included & run
the cost. But it is not happening?

Answer Posted / nanduri k. prasad

Hi

The product cost run can be done only once in a month.
Hence, though you add one more material to bom the costing
run will not change.

Try to run it in the next month. it will be automatically
updated.

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Explain the lsmw and the steps involved in them.

556


Explain customer Independent requirement .

1670


Are there any reports in sap to list of material requirement from ltp ?

642


Explain how can you create production order without routing and bom?

605


In cost controlling information system mention the fields that are listed in the list screen of the report?

692






How to create PRT master record?

1525


What are the key fields in MRP views?

1743


What is primary cost and secondary cost?

1249


What happens to planned after it has been converted into production order ?

636


Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?

583


What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?

921


What is the use of t-code cs20 in bom?

700


Explain variant configuration

636


Integration between PP and QM Module.

1331


Different types of consumption based planning.

2110