Answer Posted / ramendra verma
In Repitative Manufacturing.we dont have make the BOM
frequently.The change in production process is less.It is
Quantity based planing.Material back flushing is after the
process run.
Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
Explain how the pp module is organized in sap?
Explain In-process inspection.
Integration between PP and PM module.
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
what do you mean by planning time horizon
What is MRP Profile and MRP Group?
What are traffic lights in mrp?
Explain the mrp list and their uses.
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
Which BOM item category you have used?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is the difference between the fixing type 1, 2, 3, 4?
Integration between PP and QM Module.
How is indian slab and us slab?
What is the difference between pp and pp-pi? Which one is better and how ?