Answer Posted / kumar
: Material Master - MM01
2: BOM creation - CS01
3: Work Center creation - CR01
4: Route creation -CA01
5: PIR Generation -MD61
6: MRP Run - for Total Planning - MD01
for Single-Item, Multi-Level - MD02
7: Evaluation through MRP list and Stock requirement list -
MRP List -MD05,
Stock Requirements List - MD04
8: Conversion of Planned order to Production order - With a
planned order -CO40
With material - CO01
9: Order management - Change >With material CO02
10: Confirmations- For order CO15
For Operation -For time ticket -CO11N
11: Goods issue - MB1A--261Movement type
12: Goods receipt - For Order MB31
13: TECO or Close Order- from Prod. Order Header menu.
Is This Answer Correct ? | 39 Yes | 5 No |
Post New Answer View All Answers
What do you mean by basic dates
Explain what is prt (production resource tools) in sap pp?
What are the reports generated in product cost controlling information system?
Where we have to specify the teardown time in one operation?
Mention what is the difference between stock transport order and stock transfer order?
What is a 'product hierarchy'?
What is testing & explain standard testing
How the processing time is calculated in a wc when both labor, machine categories exist?
Why is work scheduling required for semi finished and finished products?
Explain what is the need of mrp list if the stock requirement list is already given?
What is qualification deficiency?
What is the internal recruitment?
What is a ‘routing’ in pp?
How costing is affected the pp?
Explain why their is need of production version ?