Can anyone discribe the batch management process?
Answer Posted / sathya
While making a GRN,we have to check the box of batch
management.i.e we are going to use the material only for
the production and delivery the same.
By doing this,we can calculate in this batch,how much we
have produced.
| Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
How is the vendor return processed without a purchase order reference?
What is purpose of zgr based invoice verification in purchase order?
What do you mean by outline agreement?
What is the serial number?
What happens during a 'goods issue'?
How will you map subcontracting process for project stock?
Explain subcontracting cycle
How to create movement type?
What are basic tables used for material master?
Explain the mm flow with tcodes & tables?
Explain lot sizing
How is the inventory management integrated with mm?
If I implemented mdm very recently, should I upgrade?
What are the various stock valuation methods?
What is the procedure to make the period indicator in the mrp2 view as āpā?