hi Friends this is Srinivas. Can u discribe about bug
lifecycle.how to say in interview.send me my mail
:dsrao106@gmail.com
Answer Posted / ravi kiran
New
|
Open ___ Deferred
| |
___Assign ---|
| | | ___ Rejected
Reopen |
|___Test
|
Verify
|
Close
First once the bug is found it is said to be in new state,
i.e. it is not at confirmed (approved). After it is
confirmed it is assigned and then in Testing. After
verified and if fixed then the bug is Closed.
Else it is reopened and then again assigned.
After assigining some times it is deffered to other
releases or some times rejectd.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
2. How you will collect a module from the version?
Give some examples for defect management tools?
Explain what is the hybrid framework?
How could the web element attributes be inspected in order to use them in different locators?
What is an automation testing framework?
When is automation testing useful?
What is client side validation? Write a snippet.
if i want to use different values in datatable with each iteration of for loop what would i do ??/
What do you think holds testers back to do automation? Is there a way to overcome it?
What is the major difference between Functional test, Acceptance test, Usability test and performance test. With special reference to automotive domain
Explain how to perform load-testing?
Name some of the commonly used automation testing tools that are used for functional automation.
What steps are needed in developing and running a software test?
What is the difference between close and quit command?
Discuss the economics of automation and the role of metrics in testing.