What is refurbishment order ? Explain the total cycle ?
Answer Posted / subhrajyoti bhattacharjee
A refurbishment order is a maintenance order using which
the process of refurbishing damaged equipments (having a
material and Sl No combination) can be executed.The basic
prerequisite for refurbishment is that condition based
valuation should have been activated.In the refurbishment
process damaged equipments/materials are uninstalled from a
maintenance plant and transferred to material warehouse
using movement type 101.When a certain amount of damaged
material have been accumulated , a refurbishment order is
created that would act as a cost collector for the costs
incurred in the refurbishment activity.At the end of
refurbishment, the valuation of the material changes
(increases) as its conditional state shifts from damaged to
refurbished state. Once the process is over the refurbished
equipment can be reinstalled in the maintenance plant.
| Is This Answer Correct ? | 69 Yes | 3 No |
Post New Answer View All Answers
Is it a rule that you will use pm04 order type for refurbishment? Can you configure another order type for refurbishment?
How overheades are calculated and from where the formula is picked?
What is difference between system status and user status?
When to represent an object as equipment or as functional location?
What do you understand by horizontal and hierarchical data transfer?
Which maintenance plan type is suitable for performing annul service of a car?
Where do you assign activity type in master data?
explain business completion?
You want to activate change documents functionality in order to know who changes pm order. How would you do that?
What is maintenance item?
What is the master data in sap pm?
What do the ik08 tcodes in sap- pm mean?
Which of the following Master data is relevant for PM ? ( Bill of Material ,Customer Master , Functional Location ,Vendor Master ??)
On the notification initial screen we select the notification type using iw21 t code. Is there any t code using which we can skip the initial screen and directly open the notification main screen?
How pm module is integrated with ehs module?