Answer Posted / kris
QA :-----
A planned and systematic set of activities necessary to
provide adequate confidence that requirements are properly
established and products or services conform to specified
requirements.
An activity that establishes and evaluates the processes to
produce the products
Helps establish processes.
Sets up measurements programs to evaluate processes.
Identifies weaknesses in processes and improves them.
QA is the responsibility of the entire team.
Prevents the introduction of issues or defects
QA evaluates whether or not quality control is working for
the primary purpose of determining whether or not there is
a weakness in the process.
QA improves the process that is applied to multiple
products that will ever be produced by a process.
QA personnel should not perform quality control unless
doing it to validate quality control is working.
QC : ----
The process by which product quality is compared with
applicable standards; and the action taken when
nonconformance is detected.
An activity which verifies if the product meets pre-defined
standards.
Implements the process.
Verifies if specific attribute(s) are in a specific product
or service
Identifies defects for the primary purpose of correcting
defects.
QC is the responsibility of the tester.
Detects, reports and corrects defects
QC evaluates if the application is working for the primary
purpose of determining if there is a flaw / defect in the
functionalities.
QC improves the development of a specific product or
service.
QC personnel may perform quality assurance tasks if and
when required
i think this is enough ........
enjoy...
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What kind of things that forbidden to do by a SQA Tester if He/ She don’t want to get fired?
Why are you in qa?
List out the roles of quality assurance engineer?
What are the defects found in testing banking domain?
wht type of intersting things sqa have or what is intersting abt sqa and how it will be advanategous for us as a sqa engineer?
What the first thing You’ll do as a SQA Tester if I hired You?
Differentiate verification and validation processes.
What do you like most about Quality Assurance/Testing?
Differentiate ad-hoc testing and exploratory testing?
What are the dimensions of the risks?
In case you have any doubts regarding your project, how do you approach?
Could you tell me two things you did in your previous assignment (QA/Testing related hopefully) that you are proud of?
What is the difference between quality assurance, quality control and testing?
how much it is necessary that if u r a sqa engineer then ur programming should be strong or either u have only concepts of it but u r not a good programmer.If the person is not a good programmer then do they are able to make their carrer in this field of qa and do it has good scope for them being not a good programmer?
Explain stress testing, load testing and volume testing?