Interviewer asked me to write down the critical bugs in my
career.i am working for the past 18 months in the banking
domain. my answer didn't satisfied the interviewer,can any
one help me to find out the critical bugs that may occur
while working in banking domain?
Answer Posted / chandra sekhar
Hi This is chandra sekhar,
Here I am telling critical bug .
In data base table side there are two concurrency controls .
first one is optimistice concurrency control and second one
is last one win concurrency control. optimistic concurrency
control means a row in data base table can be updated only
once. last one concurrnecy control means same row can be
updated more than once. the requirement is optimistic
concurrency control , but the developer developed with last
one concurrency control. when I entered data in the
textboxes with is primary key ID and submit the submit
button, the data has been inserted into concerned table.
Next time , When I entered different data and with same
primary key ID this same rows has been updated. here is
optimistic concurrency control voilated.
Thsi is critical bug in my project.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the difference between static testing and dynamic testing?
Can you explain the various elements of function points ftr, ilf, eif, ei, eo, eq, and gsc?
what is quality Factor
What is revision history and the content of revision history table?
how will we change the server system time?
plz tell me the difference b/w PB/MF based appl.with examples. Thanks
whats the reason to display the password(not in encrypted form) in the script in load runner but not in QTP?
Hi, this is not a tech question, i have 4 yrs of experience in Mainframe systems, presently as a mainframe tester in pune, i just want to step towards south locatios(preferable hyd), suggest me the best way to get calls from hyd.
When to stop testing? (Or) how do you decide when you have tested enough?
i need some objective type papers for my certification
What is positive and negative testing?
Risk Analysis a) 2 step, b)3 step, c) 4 step, d) 6 step
Hi friends I am kranti completed my IT diploma in 2005 & after that complete my software testing course. Now I am working in small software form as software tester. I have 2 + year experience in manual testing. Now I wan to change company. Plz told me is there any effect that I can not have any degree although I have 2 + experience ?
Work flow in testing in your company?
please anyone let me know the -ve testing of Excel sheet?