What is the difference between ATP check and availibilty
check how these reflect in sales order(which check system
considers) what are the IMG settings for the same
Answer Posted / seetharam g.k.
Q What is the difference between ATP check and availability
check how these reflect in sales order (which check system
considers) what are the IMG settings for the same
? ATP is know as available to promise quantities and it is
calculated as below.
Ware house stock + planned receipts ? Planned issues = ATP
quantities.
Ex1. 100 + 50 -75 = 75 is ATP Quantity
Any remaining open quantity in the movement is regarded as
the ATP quantity and can be used to fulfill the next
requirement.
Ex2. 25 + 100 -150 = -25 ATP Quantity,
In this case the system try to capture the stock from other
inward movement and try and match the order quantity 150.and
even this is not available and partially met then the system
shows the negative ATP Quantities in the requirement line.
? During the availability check the system determines the
ATP quantities for the material and the pant.
? The system behaves in performing the availability check
based on how the availability check is set in customizing.
? This can be viewed in the sales order ? over view screen ?
procurement and you can see the confirmed quantity and ATP
Quantity.
Availability check:
Stock checks which is automatically carried out after every
goods movement and which should prevent the book inventory
balance of physical stock (for example, available stock)
from reaching zero.
types of Availability checks
1. Against ATP
2. against product allocation
3. Against planning.
Availability check is based on checking group, Requirement
class, and Requirement type and schedule line category.
| Is This Answer Correct ? | 8 Yes | 2 No |
Post New Answer View All Answers
What is a client?
How shipping point is determined?
What is the organizational structure in sales and distribution?
How higher level item category is controlled?
What is Z transactions, and what is the use.Can u explain me what all we need to learn in logestic execution as SD consultant if we are showing shipment.
Explain how the shipping pint is determined?
What is a typical duration and cost of an sap transportation management implementation? : transportation management
How can one billing document type has 2 different number system? Basically if there are two documents belonging to same document type but for two different plants, then how come they both have different number system?
Does sap transportation management require the installation of sap erp? : transportation management
Some materials have been blocked for procurement and production. Even though deletion flag is set for a material/plant level, the order can be still entered ( with a warning message). Is there a way to block such transactions for a material flagged for deletion?
Explain about distribution channel?
Describe the shipping process for a cosignment of cargo loaded in continental Europe
Explain what is sap posting period? What is the transaction code to open and close posting period?
What is item category? How can we assign it?
What are the responsibilities of a functional consultant in an implementation project?