Answer Posted / tshiwela
you can perform increamental load by using auxiliary
parameters.
Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
What are the different ways to implement parallel processing in informatica?
Partition, what happens if the specified key range is shorter and longer
update strategy transformation in informatica
Informatica Checkpoints
What are batches?
What is the format of informatica objects in a repository? What are the databases that informatica can connect to windows?
What are the different options available for update strategy?
How does the aggregator transformation handle null values?
Is there any target staging area in informatica not staging area
What is the difference between informatica 7.0 and 8.0?
What is repository manager?
How do you handle two sessions in Informatica
What is mapplet in informatica?
How to extract sap data using informatica? What is abap? What are idocs?
How we can create indexes after completing the load process?