Answer Posted / devendra
It means parameter requires for the order creation.it is
necessary in order creation.
the stepwise customization for the order as follwing
1) create order type i.e. pp01
it is require,what type of master data to be picked up
during the order creation i.e.number range & controlling
parameter
2)assign the number range to the order type created.
it is mandatory entry, otherwise system displays error
3)create the parameter for schedulling margin key.it
requires how to schedule the prodyuction order.
4)confirmation parameter requires to complete the
production.
5)default values requires to define operation in production
order creation.
All such settings are performed in shop floor control
Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
What is primary cost and secondary cost?
Difference between base unit of measure, production unit, order unit
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What are the types of MIC?
What are the MRP master data?
Mention what is the production process in sap?
How many levels of Flexible Planning are there?
What is the t-code for changing production order and to display production order?
What is meant by payscale structure? How did you configure the payscale structure?
What is processing class, where we do them and why?
Explain what is sap pp?
Can't one material be assigned to more than one operation in a routing, why?
Tell some standard order types and what configure done for current project
Explain the gaps and the steps involved in them.