Answer Posted / shivanand bagalkoti
varienr material can be understood by somple ex CAR is
varient material car having diff colour spec like 1000cc
2000cc , fuel type petrol / diesel engine , no of cylinder
like 3 / 4 / 6 cylinder , steearing type power steering /
acmerman steering ,
Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
What is Planning time Fence?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Difference between MD01, MD02 and MD03.
What is the planning horizon?
What do you do to run MRP for just one MRP Controller?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Control keys
Why work scheduling view is required for semi-finished and finished products?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
What is routing in sap pp?
What is MRO area & MRP group & some difference
What general data appears on basic data screen?
What is primary cost and secondary cost?
What is sap pp?
Explain what is the need of mrp list if the stock requirement list is already given?