can any body tell me integration between pp with fi,mm,sd.
Answer Posted / pravin
PP integrates with MM in 1-Mat. Master (MRP view-2)
Procuerment type to determine procuerment elememt.
2-Goods Movments i.e. Goods issue against prod. order/
S.O.
PP with SD-In Mat. Master (MRP view-3)i.e. while defining
strategy in planning.
PP with FICO- in Mat. Master i.e. Costing and accounting
views
| Is This Answer Correct ? | 14 Yes | 5 No |
Post New Answer View All Answers
Explain the planning steps for 100 products?
What is the use of QM control key?
What is the use of stock requirement list?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
What is costing? How it is affected the pp?
Define ‘bom group’?
What is the difference between stock transport order and stock transfer order?
What is golive actually? What is the role of a functional consultant in golive actually?
In implementation stage tell some standard scenario before AS-Is & TO-BE
Define mrp controller
How the process time is calculated in a wc when both labour, machine categories exist?
What is the purpose of using capacity planning?
Why work scheduling view is required for semi-finished and finished products?
What is meant by payscale structure? How did you configure payscale structure?
Explain why there is need of production version?