can any body tell me integration between pp with fi,mm,sd.

Answer Posted / pravin

PP integrates with MM in 1-Mat. Master (MRP view-2)
Procuerment type to determine procuerment elememt.
2-Goods Movments i.e. Goods issue against prod. order/
S.O.
PP with SD-In Mat. Master (MRP view-3)i.e. while defining
strategy in planning.
PP with FICO- in Mat. Master i.e. Costing and accounting
views

Is This Answer Correct ?    14 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?

568


How the processing time is calculated in a wc when both labor, machine categories exist?

593


what do you mean by planning time horizon

553


• How are basic order dates determined?

1774


What are the customer activities followed for pp module ?

600






What are the three 'mrp procedures'?

653


What is planning horizon?

624


Can't one material be assigned to more than one operation in a routing, why?

600


Have you used Pull list or back flushing in REM?

1572


How did you configure the payscale structure?

596


What is primary cost and secondary cost?

1249


What is the internal recruitment?

583


What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?

736


How requirements( pir,sles order, customer requirement) are reduced after they are produced?

617


What are the parameters are there in Order type or in dependent para. config?

1101