can any body tell me integration between pp with fi,mm,sd.
Answer Posted / pravin
PP integrates with MM in 1-Mat. Master (MRP view-2)
Procuerment type to determine procuerment elememt.
2-Goods Movments i.e. Goods issue against prod. order/
S.O.
PP with SD-In Mat. Master (MRP view-3)i.e. while defining
strategy in planning.
PP with FICO- in Mat. Master i.e. Costing and accounting
views
Is This Answer Correct ? | 14 Yes | 5 No |
Post New Answer View All Answers
Can anybody explain to me why the work scheduling view is required for semi-finished and finished products?
How the processing time is calculated in a wc when both labor, machine categories exist?
what do you mean by planning time horizon
• How are basic order dates determined?
What are the customer activities followed for pp module ?
What are the three 'mrp procedures'?
What is planning horizon?
Can't one material be assigned to more than one operation in a routing, why?
Have you used Pull list or back flushing in REM?
How did you configure the payscale structure?
What is primary cost and secondary cost?
What is the internal recruitment?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
What are the parameters are there in Order type or in dependent para. config?