Answer Posted / sunil reddy
Testing an integrated system is called system testing
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what are the 3 test tool categories and describe what each can do.
Test approach to windows scheduler?
What is early testing?
how agile testing is performed and what are the related documents.
What are the different ways to check a date field in a website?
What is difference between cmmi and cmm levels?
approx how long a simple website take time just for manual testing including report generation.
What is the test case?
uses of checklist
Build with fixes has been deployed on QA environment if asked by your manager to reproduce how can you reproduce the issues? (by using the previous build) Can you access the previous build? If so ,what are the tools or how can you access?
About Hierarchy level in your company.
Explain what is exhaustive testing?
Did you ever worked with B.A's and when?
Can you explain exploratory testing?
What is the difference between baseline and traceability matrix?