Do we include sub-contracting stock (material provided to vendor) in physical inventory? Why?

Answer Posted / biswajit jash

Yes until the GR Received from SubCon Vendor, no Accounting posting happend therefore materials must be included in Phy Inventory for Stock Valuation.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the lot size attributes a material can posses?

713


Explain the 'transaction keys' in mm?

710


What is the importance of the batch record?

607


How to delete a batch?

683


If you want to make item ok check boix as default then what will you do?

635






How is the vendor return processed without a purchase order reference?

643


Why is negative stock needed in an organization?

782


The terms planned delivery and gr processing time?

662


If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?

830


Is it possible to activate split valuation after posting several transaction for materials?

703


What is a profit center?

687


Explain stock transfers?

674


What is a batch?

646


What information does consignment info record contain?

673


What is the sequence of determining the vendor : quota arrangement, source list, pir, old po. Arrange them in right sequence.

1039