In a particular program one file is used where override
command is applied to a file, now this program calls
another program where we want to use the same file but
without override.How it can be done?

Answer Posted / vivek dwivedi

Share ODM (*NO)

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how does the rpg element work?

722


if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.

2203


What is the purpose of record level identifier?

732


how can I tell when to replace the array?

706


When we have a file with Duplicate records and I want to read the unique record from the file. For example a file containing Emp Name as 'Ram' and there are 3 entries of it. So how to read a unique record from File?

511






How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1567


what is the use of sflnxtchg?

807


What is the diff bw PF/LF Name and their Record format name? what is restriction in record format then file name?

2521


what is the necessary keyword needed to scroll subfile records?

707


How can we override a file during runtime in rpg?

690


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1765


How can we know running job is batch or interactive?

660


How to write record if no field or the field are different in physical file in rpgle ?

494


Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg

721


what was the robotech rpg?

689