We have a Physical file, after reading 5 records,it has to
read LF of that same Physical file,Will it start reading
from Ist record or will start reading from 5th record?

Answer Posted / raj

It will read, based on the key list to the LF

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.

2201


How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique

551


What is a record lock error?

1270


Interviewer asked me write down DDS for load all subfile .can anybody write dds

1025


do you use message subfiles? What are the necessary keywords required coding a message subfile?

692






how do you use commitment control in rpg?

759


what is the necessary keyword needed to scroll subfile records?

706


How to create a login screen using a command instead of display file.... intention is to get a password field on a command..... how do you achieve this...

1317


Set on command is used for closed all opened files , initialize var and release resource , return cmd is used for return to calling program but my req. Is dnt close opened files and resource must released while doing transactions , how can i do this...?

1466


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1765


how does the rpg element work?

720


What is ment by record level identifier?

659


what is kids-rpg?

671


what is data area and how it is used in rpg program ?

758


what do you mean by an input subfile, what are the keywords required?

777