Describe control key utility & also standard key ? how many
fields can be configured for standard value key?

Answer Posted / prakash

1. Control key is basically used in Operations( Routing or Master recipe). With the use of control key u Choose Scheduling,capacities,cost,rework,Automatic GR should be considered for the Operation or not.

2. Standard value key: In Standard there will be 3 parameters defined and if we want to configure seperately we can configure a maximum of 6 parameteres for SVK.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what are the constraints of Variant configuration?

1690


What is the use of mrp group?

654


What are the types of master views for production and planning?

675


what is std info set? where it is used?

1973


You want to integrate pp with fico. What steps would you take?

588






Explain what is “work center” in sap pp and what is the use of data in work centers?

641


Special Procurement type 40 – proc. form alt. plant

2151


What is the use of t-code cs20 in bom?

702


What is the use of data in work centers?

670


What is the use of stock requirement list?

649


What is mrp controller means?

608


What is the output of mps run ?

605


What is Backflush, the places where the backflush is used?

1661


What is mrp group and what is the use of it?

624


What are sequence, parallel, overlapping, splitting and where can we assign these

1534